**PARK AVENUE BRIDGE CLOSURE:** The bridge will be closed starting April 11 until summer of 2023. **11TH STREET BRIDGE CLOSURE:** The bridge will be closed starting September 19 until fall of 2023.
**PARK AVE BRIDGE CLOSURE:** The bridge will be closed starting April 11 until summer of 2023. **11TH STREET BRIDGE CLOSURE:** The bridge will be closed starting September 19 until fall of 2023.
powered by bulletin

The Courier | Waterloo OKs replacing two Cedar River bridges

Bridge Damage

WATERLOO — The city is moving forward with a feasibility study to replace two major Cedar River bridges in the next two years.

Read the full article HERE